Main Page: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 2: | Line 2: | ||
We are performing a [[User Audit]] please click the page for more information. | We are performing a [[User Audit]] please click the page for more information. | ||
==Downtimes== | |||
Date: Thursday, August 23rd | |||
Time: 6pm | |||
Duration: 30mins | |||
Systems: imap.umiacs.umd.edu | |||
This is the 2nd stage of our upgrade to IMAP and we are taking downtime on the IMAP server to install some new hardware. This will allow the server to be more fault tolerant and give us the ability to add capacity without downtimes in the future. There will be another longer downtime in the future to do the final (3rd) stage of this upgrade. | |||
All mail will be queued and delivered as the server comes back up. | |||
NOTE: Exchange will '''NOT''' be affected during this outage. | |||
==Technical Reference== | ==Technical Reference== |
Revision as of 21:07, 20 August 2007
Anouncements
We are performing a User Audit please click the page for more information.
Downtimes
Date: Thursday, August 23rd Time: 6pm Duration: 30mins Systems: imap.umiacs.umd.edu
This is the 2nd stage of our upgrade to IMAP and we are taking downtime on the IMAP server to install some new hardware. This will allow the server to be more fault tolerant and give us the ability to add capacity without downtimes in the future. There will be another longer downtime in the future to do the final (3rd) stage of this upgrade.
All mail will be queued and delivered as the server comes back up.
NOTE: Exchange will NOT be affected during this outage.